Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.

Streetview is not available at this location

Coordinates: 46.297606, -118.3192584
Project ID: Pr_M_01

Roadway: Reconstruction

From: 1st Street
To: Front Street
Length: 0.09


Project Sponsor: Prescott

Safety Focus: Protect Pedestrians and Bicycles

Pedestrian: Curb-tight Sidewalk

Bicycle: -

Vehicle Capacity: -

Current Cost: $450,000

Plan Phase: Medium-term 2026-2035

Future Cost: $698,800

Roadway Class: Local

Current Lanes: 2

Future Lanes: 2

BENEFITS TO: Safety: ++

Preservation-Condition: ++

Accessibility-Mobility: ++

Integration-Connectivity: ++

Resiliency-Reliability: +

Economic Vitality: +

Stewardship: +

Security: +

Efficiency-Operations: +

Travel-Tourism: o
© 2024 PlaceVision Inc | Help | Privacy