Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.

Streetview is not available at this location

Coordinates: 46.27328364, -118.153993
Project ID: Wb_T_02

Roadway: Reconstruction

From: Main Street
To: City Limits
Length: 0.2


Project Sponsor: Waitsburg

Safety Focus: -

Pedestrian: Curb-tight Sidewalk

Bicycle: -

Vehicle Capacity: -

Current Cost: $583,403

Plan Phase: Funded - in progress

Future Cost: $583,403

Roadway Class: Major Collector

Current Lanes: 2

Future Lanes: 2

BENEFITS TO: Safety: +

Preservation-Condition: ++

Accessibility-Mobility: ++

Integration-Connectivity: +

Resiliency-Reliability: o

Economic Vitality: +

Stewardship: +

Security: o

Efficiency-Operations: o

Travel-Tourism: +
© 2024 PlaceVision Inc | Help | Privacy