Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.

Streetview is not available at this location

Coordinates: 46.12196789, -118.4061121
Project ID: WC_M_10

Roadway: Reconstruction and Realignment

From: 2
To: 3.35
Length: 1.35


Project Sponsor: Walla Walla County

Safety Focus: Prevent Roadway Departure

Pedestrian: -

Bicycle: Widened Shoulder 4+ ft

Vehicle Capacity: -

Current Cost: $60,000

Plan Phase: Medium-term 2026-2035

Future Cost: $93,200

Roadway Class: Major Collector

Current Lanes: 2

Future Lanes: 2

BENEFITS TO: Safety: ++

Preservation-Condition: +

Accessibility-Mobility: o

Integration-Connectivity: ++

Resiliency-Reliability: o

Economic Vitality: ++

Stewardship: o

Security: +

Efficiency-Operations: o

Travel-Tourism: o
Anonymous
If "realignment" means "straightening", then straightening generally seems unnecessary. I like the idea of adding a lane for bicyclists, but cutting a new path for an entire road to get it seems unnecessary and costly.
Vehicle capacity // Capacidad para vehículos
© 2024 PlaceVision Inc | Help | Privacy