Project ID: WD_I_01

Future Thoroughfare: Interchange

From: Clinton St
To: Clinton St
Length: 0.7


Project Sponsor: WSDOT -- WW

Safety Focus: Protect Pedestrians and Bicycles

Pedestrian: Curb-tight Sidewalk

Bicycle: Bikelane

Vehicle Capacity: Grade Separation

Current Cost: $35,000,000

Plan Phase: Unfunded - long-term planning

Future Cost: -

Roadway Class: Freeway/Expressway

Current Lanes: 4

Future Lanes: 4

BENEFITS TO: Safety: ++

Preservation-Condition: o

Accessibility-Mobility: ++

Integration-Connectivity: ++

Resiliency-Reliability: ++

Economic Vitality: ++

Stewardship: o

Security: +

Efficiency-Operations: ++

Travel-Tourism: +
Anonymous
Only 1/2 mile of Clinton south of US12 has a centerline. Any traffic going to Boyer or Alder will have difficulty getting through on such a narrow road. If Myra can be extended nearly a mile north of Rose to meet US12, why can't Wilbur be extended 1/3 mile to Middle Waitsburg Road?
Potential Future Connections // Posibles Conexiones en el Futuro
© 2024 PlaceVision Inc | Help | Privacy