Mill Creek Trail Re-Pave
Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.
Streetview is not available at this location
Coordinates: 46.07395589, -118.2923136
Project ID: WW_L_19
To: Tausick
Length: 0.9
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Multi-use Path 10+ ft
Bicycle: Off-road Path
Vehicle Capacity: -
Current Cost: $150,000
Plan Phase: Long-term 2036-2045
Future Cost: $361,800
Roadway Class: -
Current Lanes: -
Future Lanes: -
BENEFITS TO: Safety: +
Preservation-Condition: ++
Accessibility-Mobility: ++
Integration-Connectivity: ++
Resiliency-Reliability: +
Economic Vitality: +
Stewardship: +
Security: +
Efficiency-Operations: +
Travel-Tourism: +
Ped/Bike: Pedestrian and Bicycle Improvements
From: CambridgeTo: Tausick
Length: 0.9
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Multi-use Path 10+ ft
Bicycle: Off-road Path
Vehicle Capacity: -
Current Cost: $150,000
Plan Phase: Long-term 2036-2045
Future Cost: $361,800
Roadway Class: -
Current Lanes: -
Future Lanes: -
BENEFITS TO: Safety: +
Preservation-Condition: ++
Accessibility-Mobility: ++
Integration-Connectivity: ++
Resiliency-Reliability: +
Economic Vitality: +
Stewardship: +
Security: +
Efficiency-Operations: +
Travel-Tourism: +