SW 4th 4Bikes Project
Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.
Streetview is not available at this location
Coordinates: 46.04933932, -118.3937814
Project ID: CP_T_02
To: Academy Way
Length: 0.51
Project Sponsor: College Place
Safety Focus: Previous Injury Location
Pedestrian: Curb-tight Sidewalk
Bicycle: Buffered Bikelane
Vehicle Capacity: -
Current Cost: $866,000
Plan Phase: Funded - in progress
Future Cost: $866,000
Roadway Class: Major Collector
Current Lanes: 3
Future Lanes: 3
BENEFITS TO: Safety: ++
Preservation-Condition: o
Accessibility-Mobility: ++
Integration-Connectivity: ++
Resiliency-Reliability: +
Economic Vitality: +
Stewardship: ++
Security: ++
Efficiency-Operations: ++
Travel-Tourism: +
Ped/Bike: Bicycle Improvements
From: College AvenueTo: Academy Way
Length: 0.51
Project Sponsor: College Place
Safety Focus: Previous Injury Location
Pedestrian: Curb-tight Sidewalk
Bicycle: Buffered Bikelane
Vehicle Capacity: -
Current Cost: $866,000
Plan Phase: Funded - in progress
Future Cost: $866,000
Roadway Class: Major Collector
Current Lanes: 3
Future Lanes: 3
BENEFITS TO: Safety: ++
Preservation-Condition: o
Accessibility-Mobility: ++
Integration-Connectivity: ++
Resiliency-Reliability: +
Economic Vitality: +
Stewardship: ++
Security: ++
Efficiency-Operations: ++
Travel-Tourism: +