Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.

Streetview is not available at this location

Coordinates: 46.02580554, -118.3888639
Project ID: WD_M_01

Ped/Bike: Pedestrian and Bicycle Improvements

From: n/a
To: n/a
Length: n/a


Project Sponsor: WSDOT

Safety Focus: -

Pedestrian: Multi-use Path 10+ ft

Bicycle: -

Vehicle Capacity: -

Current Cost: $1,500,000

Plan Phase: Medium-term 2026-2035

Future Cost: $2,329,500

Roadway Class: Principal Arterial

Current Lanes: 4

Future Lanes: 4

BENEFITS TO: Safety: ++

Preservation-Condition: ++

Accessibility-Mobility: ++

Integration-Connectivity: ++

Resiliency-Reliability: o

Economic Vitality: +

Stewardship: +

Security: o

Efficiency-Operations: +

Travel-Tourism: +
© 2024 PlaceVision Inc | Help | Privacy