Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.

Streetview is not available at this location

Coordinates: 46.03246119, -118.3221036
Project ID: WW_L_18

Ped/Bike: Pedestrian Improvements

From: Thunder Ridge
To: Russell Creek
Length: 0.1


Project Sponsor: Walla Walla

Safety Focus: Protect Pedestrians and Bicycles

Pedestrian: Multi-use Path 10+ ft

Bicycle: Bikelane

Vehicle Capacity: -

Current Cost: $400,000

Plan Phase: Long-term 2036-2045

Future Cost: $964,700

Roadway Class: Minor Arterial

Current Lanes: -

Future Lanes: -

BENEFITS TO: Safety: ++

Preservation-Condition: +

Accessibility-Mobility: ++

Integration-Connectivity: ++

Resiliency-Reliability: +

Economic Vitality: +

Stewardship: +

Security: +

Efficiency-Operations: +

Travel-Tourism: +
© 2024 PlaceVision Inc | Help | Privacy