Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.

Streetview is not available at this location

Coordinates: 46.04932999, -118.3420372
Project ID: WW_M_06

Ped/Bike: Pedestrian Improvements

From: 4th
To: Plaza
Length: 0.35


Project Sponsor: Walla Walla

Safety Focus: Protect Pedestrians and Bicycles

Pedestrian: Curb-tight Sidewalk

Bicycle: Bikelane

Vehicle Capacity: -

Current Cost: $880,000

Plan Phase: Medium-term 2026-2035

Future Cost: $1,366,600

Roadway Class: Minor arterial

Current Lanes: 2

Future Lanes: 2

BENEFITS TO: Safety: ++

Preservation-Condition: +

Accessibility-Mobility: ++

Integration-Connectivity: ++

Resiliency-Reliability: +

Economic Vitality: +

Stewardship: +

Security: +

Efficiency-Operations: +

Travel-Tourism: +
Anonymous
Should be easy to finish the sidewalk on the south side of Tietan, most of it already has sidewalk.