Main-Palouse-Boyer Intersection Accessibility
Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.
Streetview is not available at this location
Coordinates: 46.06958964, -118.3355272
Project ID: WW_L_24
To: n/a
Length: n/a
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: -
Current Cost: $100,000
Plan Phase: Long-term 2036-2045
Future Cost: $241,200
Roadway Class: Major Collector
Current Lanes: -
Future Lanes: -
BENEFITS TO: Safety: ++
Preservation-Condition: +
Accessibility-Mobility: ++
Integration-Connectivity: +
Resiliency-Reliability: o
Economic Vitality: +
Stewardship: +
Security: +
Efficiency-Operations: +
Travel-Tourism: +
Ped/Bike: Improvements for Persons with Disabilit*
From: n/aTo: n/a
Length: n/a
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: -
Current Cost: $100,000
Plan Phase: Long-term 2036-2045
Future Cost: $241,200
Roadway Class: Major Collector
Current Lanes: -
Future Lanes: -
BENEFITS TO: Safety: ++
Preservation-Condition: +
Accessibility-Mobility: ++
Integration-Connectivity: +
Resiliency-Reliability: o
Economic Vitality: +
Stewardship: +
Security: +
Efficiency-Operations: +
Travel-Tourism: +