SR 125 Spur/N 13th Ave to Myra Rd - ADA
Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.
Streetview is not available at this location
Coordinates: 46.06861314, -118.3628597
Project ID: WD_L_01
To: Myra Rd
Length: 0.75
Project Sponsor: WSDOT
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: -
Vehicle Capacity: -
Current Cost: $116,790
Plan Phase: Long-term 2036-2045
Future Cost: $281,700
Roadway Class: Principal Arterial
Current Lanes: 2
Future Lanes: 2
BENEFITS TO: Safety: +
Preservation-Condition: ++
Accessibility-Mobility: +
Integration-Connectivity: ++
Resiliency-Reliability: o
Economic Vitality: ++
Stewardship: +
Security: +
Efficiency-Operations: o
Travel-Tourism: o
Ped/Bike: Improvements for Persons with Disabilit*
From: N 13th AveTo: Myra Rd
Length: 0.75
Project Sponsor: WSDOT
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: -
Vehicle Capacity: -
Current Cost: $116,790
Plan Phase: Long-term 2036-2045
Future Cost: $281,700
Roadway Class: Principal Arterial
Current Lanes: 2
Future Lanes: 2
BENEFITS TO: Safety: +
Preservation-Condition: ++
Accessibility-Mobility: +
Integration-Connectivity: ++
Resiliency-Reliability: o
Economic Vitality: ++
Stewardship: +
Security: +
Efficiency-Operations: o
Travel-Tourism: o