Alert
Walla Walla Valley Transportation - 2045 Plan
- 133 Projects
- 38 Comments
El propósito del Plan 2045 es guiar las inversiones en todos los medios de transporte: por carretera, bicicleta, peatonal, transporte público y de carga. Por favor, revisa los proyectos de los últimos 25 años y dinos si están abordando las necesidades de la comunidad.
Like
Add Comment
Add Comment
Add A Comment
Respond
Please tell us why you disagree
Eagle Crest Dr
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.
Streetview is not available at this location
Future Thoroughfare
From: Eagle Crest DrTo: Kendall Rd
Length: 0.29
Project Sponsor: Walla Walla
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: New Roadway Connection
Current Cost: $330,600
Plan Phase: Unfunded - long-term planning
Future Cost: -
Roadway Class: Proposed Local
Current Lanes: 0
Future Lanes: 2
BENEFITS TO: Safety: +
Preservation-Condition: +
Accessibility-Mobility: ++
Integration-Connectivity: ++
Resiliency-Reliability: +
Economic Vitality: +
Stewardship: +
Security: +
Efficiency-Operations: ++
Travel-Tourism: o
Walla Walla Valley Transportation - 2045 Plan
Provide us with your feedback on the proposed transportation projects for the 2045 Plan.Proporciónenos su opinión sobre los proyectos de transporte propuestos para el Plan 2045.
- Comments TimelineComments Timeline
- Map Layers
- Projects
-
-
4th Ave Extension: MM-8a
Future Thoroughfare
Project Sponsor: Walla Walla
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: New Roadway Connection
Current Cost: $2,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: 4th Ave
To: Future: NR-61View DetailsDetails
-
Eagle Crest Dr
Future Thoroughfare
Project Sponsor: Walla Walla
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: New Roadway Connection
Current Cost: $330,600
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Eagle Crest Dr
To: Kendall RdView DetailsDetails
-
McMinn Rd Extension
Future Thoroughfare
Project Sponsor: College Place
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: New Roadway Connection
Current Cost: $450,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: McMinn Rd
To: SR 125View DetailsDetails
-
3 years 7 months ago
Anonymous
This intersection is close to that of Old Milton Highway. I wonder what would happen if College Avenue were to dead-end or follow the frontage road to OMH via Aufty Ln and the driveway to 2264 OMH.
-
-
Myra Rd - Rees Ave
Future Thoroughfare
Project Sponsor: Walla Walla
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: New Roadway Connection
Current Cost: $433,200
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Dell Ave
To: Rees AveView DetailsDetails
-
PLAZA WAY MP 0.00 TO MP 0.34
Future Thoroughfare
Project Sponsor: Walla Walla County
Safety Focus: -
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $760,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: 0
To: 0.34View DetailsDetails
-
Prescott New Road: Parallel to Skyrocket Rd
Future Thoroughfare
Project Sponsor: Prescott
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: New Roadway Connection
Current Cost: $433,200
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: W 4th St
To: UGA BoundaryView DetailsDetails
-
Southside extension: Clarence-Doans Extension
Future Thoroughfare
Project Sponsor: College Place
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Off-road Path
Vehicle Capacity: New Roadway Connection
Current Cost: $2,629,800
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Julia Street
To: Brickner RdView DetailsDetails
-
3 years 6 months ago
Cheryl Zuver
I definitely oppose this project. It will add too much traffic to Brickner Road. Who would be responsible for patrolling this area? No one stops at the stop sign on the corner of Brickner and Grandview, my husband was broadsided at that intersection. I vote NO
-
3 years 6 months ago
Jeffrey Fernald
The Clarence-Doans Extension is an ill-conceived idea. It would takeout a septic drain field, a well , a house, and maybe even another house. It would increase traffic on Brickner and Clarence, narrow roads and somewhat dangerous now. They will be very dangerous for children, pedestrians, and cars.
-
3 years 6 months ago
Rodney Loomer
Connecting Doans to Clarence will make Brickner and Clarence dangerous. It will become an outlet from Hayden Homes to Walmart and the High school. Cars often don't stop at stop signs and drive very fast on narrow roads. There likely will be more pedestrian-car accidents. We just had one on SW 12th.
-
3 years 6 months ago
Rodney Loomer
Connecting Doans to Clarence will make Brickner and Clarence dangerous. It will become an outlet from Hayden Homes to Walmart and the High school. Cars often don't stop at stop signs and drive very fast on narrow roads. There likely will be more pedestrian-car accidents. We just had one on SW 12th.
-
3 years 6 months ago
Rodney Loomer
Connecting Doans to Clarence will make Brickner and Clarence dangerous. It will become an outlet from Hayden Homes to Walmart and the High school. Cars often don't stop at stop signs and drive very fast on narrow roads. There likely will be more pedestrian-car accidents. We just had one on SW 12th.
-
3 years 6 months ago
Rodney Loomer
Connecting Doans to Clarence will make Brickner and Clarence dangerous. It will become an outlet from Hayden Homes to Walmart and the High school. Cars often don't stop at stop signs and drive very fast on narrow roads. There likely will be more pedestrian-car accidents. We just had one on SW 12th.
-
3 years 6 months ago
Jeffrey Fernald
The Clarence-Doans Extension is an ill-conceived idea. It would takeout a septic drain field, a well , a house, and maybe even another house. It would increase traffic on Brickner and Clarence, narrow roads and somewhat dangerous now. They will be very dangerous for children, pedestrians, and cars.
-
-
SW 4th Street Extension
Future Thoroughfare
Project Sponsor: College Place
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Buffered Bikelane
Vehicle Capacity: New Roadway Connection
Current Cost: $1,077,600
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Doans Avenue
To: Academy WayView DetailsDetails
-
SW Davis Street Extension Project
Future Thoroughfare
Project Sponsor: College Place
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: New Roadway Connection
Current Cost: $1,584,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Fourth Street
To: 12th StreetView DetailsDetails
-
3 years 7 months ago
Anonymous
New north-South road needed in College Place to the west of College Avenue
-
3 years 6 months ago
Anonymous
There in no need to push SW Davis to 12th St, there is a street on the west side of College Ave It's name is Bade St. and that plenty.
-
-
US 12/Wallula to Nine Mile Hill - P8: CN Phase
Future Thoroughfare
Project Sponsor: WSDOT
Safety Focus: Previous Fatality Location
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: New Roadway Connection
Current Cost: $195,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Wallula
To: Nine Mile HillView DetailsDetails
-
Walla Walla New Road: NR-61
Future Thoroughfare
Project Sponsor: Walla Walla
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: New Roadway Connection
Current Cost: $20,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: SR 125
To: Lower Waitsburg RdView DetailsDetails
-
Walla Walla New Road: NR-61 Extension
Future Thoroughfare
Project Sponsor: Walla Walla
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: New Roadway Connection
Current Cost: $1,048,800
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Lower Waitsburg Rd
To: Middle Waitsburg RdView DetailsDetails
-
3 years 7 months ago
Anonymous
This whole road is long overdue, imo. I'd like to see it extended to Airport Road.
-
-
Wilbur Ave Extension - Bryant to Reser
Future Thoroughfare
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: New Roadway Connection
Current Cost: $3,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Bryant
To: ReserView DetailsDetails
-