Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.

Streetview is not available at this location

Coordinates: 46.04188009, -118.3938963
Project ID: CP_I_02

Future Thoroughfare

From: Fourth Street
To: 12th Street
Length: 0.5


Project Sponsor: College Place

Safety Focus: Protect Pedestrians and Bicycles

Pedestrian: Curb-tight Sidewalk

Bicycle: Signed/Shared Route

Vehicle Capacity: New Roadway Connection

Current Cost: $1,584,000

Plan Phase: Unfunded - long-term planning

Future Cost: -

Roadway Class: Prop. Major Collector

Current Lanes: 0/3

Future Lanes: 3

BENEFITS TO: Safety: ++

Preservation-Condition: ++

Accessibility-Mobility: ++

Integration-Connectivity: +

Resiliency-Reliability: +

Economic Vitality: +

Stewardship: +

Security: +

Efficiency-Operations: +

Travel-Tourism: +
Anonymous
There in no need to push SW Davis to 12th St, there is a street on the west side of College Ave It's name is Bade St. and that plenty.
Potential Future Connections // Posibles Conexiones en el Futuro
Anonymous
New north-South road needed in College Place to the west of College Avenue
Potential Future Connections // Posibles Conexiones en el Futuro
© 2024 PlaceVision Inc | Help | Privacy