Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.

Streetview is not available at this location

Coordinates: 46.11519044, -118.9228595
Project ID: WD_T_01

Paving

From: Dodd Rd Vic
To: Wallula Vic
Length: 3


Project Sponsor: WSDOT

Safety Focus: -

Pedestrian: -

Bicycle: -

Vehicle Capacity: -

Current Cost: $2,378,000

Plan Phase: Funded - starting soon

Future Cost: $2,378,000

Roadway Class: Principal Arterial

Current Lanes: 2/4

Future Lanes: 2/4

BENEFITS TO: Safety: +

Preservation-Condition: ++

Accessibility-Mobility: o

Integration-Connectivity: o

Resiliency-Reliability: o

Economic Vitality: ++

Stewardship: o

Security: o

Efficiency-Operations: o

Travel-Tourism: ++
© 2024 PlaceVision Inc | Help | Privacy