Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.

Streetview is not available at this location

Coordinates: 46.04923699, -118.3460426
Project ID: WW_T_02

Paving and Lane Changes

From: 9th Ave
To: Village Way
Length: 0.3


Project Sponsor: Walla Walla

Safety Focus: Previous Injury Location

Pedestrian: Curb-tight Sidewalk

Bicycle: Bikelane

Vehicle Capacity: Reduction in Number of Lanes

Current Cost: $2,390,000

Plan Phase: Funded - in progress

Future Cost: $2,390,000

Roadway Class: Minor Arterial

Current Lanes: 4

Future Lanes: 3

BENEFITS TO: Safety: ++

Preservation-Condition: +

Accessibility-Mobility: ++

Integration-Connectivity: ++

Resiliency-Reliability: ++

Economic Vitality: ++

Stewardship: ++

Security: +

Efficiency-Operations: ++

Travel-Tourism: ++
© 2024 PlaceVision Inc | Help | Privacy