Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.

Streetview is not available at this location

Coordinates: 46.03890226, -118.3609695
Project ID: WW_M_08

New: Construction

From: SR 125
To: Taumarson
Length: 0.5


Project Sponsor: Walla Walla

Safety Focus: Protect Pedestrians and Bicycles

Pedestrian: Buffered Sidewalk

Bicycle: Bikelane

Vehicle Capacity: Increase in Lanes

Current Cost: $9,000,000

Plan Phase: Medium-term 2026-2035

Future Cost: $13,976,700

Roadway Class: Minor Arterial

Current Lanes: 0

Future Lanes: 3

BENEFITS TO: Safety: +

Preservation-Condition: +

Accessibility-Mobility: ++

Integration-Connectivity: ++

Resiliency-Reliability: ++

Economic Vitality: ++

Stewardship: +

Security: +

Efficiency-Operations: +

Travel-Tourism: +
Anonymous
It might be interesting if this was extended to become a freeway to Milton-Freewater. Current WA-125/OR-11 is dangerous, and one roundabout won't fix problems on the entire 10-mile corridor.
Potential Future Connections // Posibles Conexiones en el Futuro
Anonymous
This really should be done before the roundabout at 9th/plaza/Dalles Military Road. Would help with detour traffic!
Project // Proyecto
© 2024 PlaceVision Inc | Help | Privacy