US 12/Wallula to Nine Mile Hill - P8: PE-RW Phases
Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.
Streetview is not available at this location
Coordinates: 46.09160327, -118.8364728
Project ID: WD_T_16
To: Nine Mile Hill
Length: 13
Project Sponsor: WSDOT
Safety Focus: Previous Fatality Location
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: Increase in Lanes
Current Cost: $21,800,000
Plan Phase: Funded - in progress
Future Cost: $21,800,000
Roadway Class: Freeway/Expressway
Current Lanes: 0
Future Lanes: 4
BENEFITS TO: Safety: ++
Preservation-Condition: +
Accessibility-Mobility: o
Integration-Connectivity: ++
Resiliency-Reliability: ++
Economic Vitality: ++
Stewardship: +
Security: ++
Efficiency-Operations: ++
Travel-Tourism: ++
New: Design and Right-of-Way
From: WallulaTo: Nine Mile Hill
Length: 13
Project Sponsor: WSDOT
Safety Focus: Previous Fatality Location
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: Increase in Lanes
Current Cost: $21,800,000
Plan Phase: Funded - in progress
Future Cost: $21,800,000
Roadway Class: Freeway/Expressway
Current Lanes: 0
Future Lanes: 4
BENEFITS TO: Safety: ++
Preservation-Condition: +
Accessibility-Mobility: o
Integration-Connectivity: ++
Resiliency-Reliability: ++
Economic Vitality: ++
Stewardship: +
Security: ++
Efficiency-Operations: ++
Travel-Tourism: ++