Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.

Streetview is not available at this location

Coordinates: 46.04983879, -118.3781595
Project ID: CP_M_05

Intersection: Reconstruction

From: Larch Avenue
To: Whitman Drive
Length: 0.05


Project Sponsor: College Place

Safety Focus: Protect Pedestrians and Bicycles

Pedestrian: Curb-tight Sidewalk

Bicycle: Signed/Shared Route

Vehicle Capacity: New Traffic Light

Current Cost: $304,160

Plan Phase: Medium-term 2026-2035

Future Cost: $472,400

Roadway Class: Minor Arterial

Current Lanes: 3

Future Lanes: 3

BENEFITS TO: Safety: ++

Preservation-Condition: ++

Accessibility-Mobility: ++

Integration-Connectivity: +

Resiliency-Reliability: +

Economic Vitality: +

Stewardship: +

Security: +

Efficiency-Operations: ++

Travel-Tourism: +
© 2024 PlaceVision Inc | Help | Privacy