Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.

Streetview is not available at this location

Coordinates: 46.06905954, -118.9079342
Project ID: WD_T_10

Bridge: Painting

From: Wallula Jct. Vic
To: n/a
Length: 0.1


Project Sponsor: WSDOT

Safety Focus: -

Pedestrian: -

Bicycle: -

Vehicle Capacity: -

Current Cost: $1,245,723

Plan Phase: Funded - in progress

Future Cost: $1,245,723

Roadway Class: Principal Arterial

Current Lanes: 2

Future Lanes: 2

BENEFITS TO: Safety: o

Preservation-Condition: ++

Accessibility-Mobility: o

Integration-Connectivity: +

Resiliency-Reliability: ++

Economic Vitality: ++

Stewardship: +

Security: ++

Efficiency-Operations: o

Travel-Tourism: +
© 2024 PlaceVision Inc | Help | Privacy