Thank you so much for your interest. The comment period was closed on October 20, 2020.
Muchas gracias por su interés. El período de comentarios se cerró el 20 de octubre de 2020.

Streetview is not available at this location

Coordinates: 46.10107249, -118.4710772
Project ID: WC_T_04

Bridge: Rehabilitation

From: 3.99
To: 4.09
Length: 0.1


Project Sponsor: Walla Walla County

Safety Focus: Prevent Roadway Departure

Pedestrian: -

Bicycle: -

Vehicle Capacity: -

Current Cost: $956,250

Plan Phase: Funded - in progress

Future Cost: $956,250

Roadway Class: Major Collector

Current Lanes: 2

Future Lanes: 2

BENEFITS TO: Safety: o

Preservation-Condition: ++

Accessibility-Mobility: o

Integration-Connectivity: +

Resiliency-Reliability: ++

Economic Vitality: +

Stewardship: +

Security: ++

Efficiency-Operations: o

Travel-Tourism: o
© 2024 PlaceVision Inc | Help | Privacy