Walla Walla Valley Transportation - 2045 Plan
Provide us with your feedback on the proposed transportation projects for the 2045 Plan.Proporciónenos su opinión sobre los proyectos de transporte propuestos para el Plan 2045.
- Comments TimelineComments Timeline
- Map Layers
- Projects
A. Projects with safety focus // Proyectos centrados en la seguridad
- Countywide Signing and Guideposts
Safety: Signs and Guideposts
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $145,000
Plan Phase: Funded - in progress
Future Cost: $145,000
From: n/a
To: n/aView DetailsDetails
- Opticom System Upgrades
Safety: Technology Upgrade
Project Sponsor: Walla Walla
Safety Focus: Safety
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $250,000
Plan Phase: Medium-term 2026-2035
Future Cost: $388,200
From: Various
To: VariousView DetailsDetails
- SCR 2021 Region Wide BCT Replacement - Freeway
Safety: Guardrail Improvements
Project Sponsor: WSDOT
Safety Focus: Safety
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $124,028
Plan Phase: Funded - in progress
Future Cost: $124,028
From: Various
To: VariousView DetailsDetails
- SR 128 et al/SE Washington
Safety: Centerline rumble strips
Project Sponsor: WSDOT
Safety Focus: Safety
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $353,711
Plan Phase: Funded - in progress
Future Cost: $353,711
From: Various
To: VariousView DetailsDetails
- US 730/3.0 Miles N of Oregon Border - Rockfall Pr.
Safety: Rockfall Prevention
Project Sponsor: WSDOT
Safety Focus: Safety
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $1,535,603
Plan Phase: Funded - in progress
Future Cost: $1,535,603
From: Port Kelley Vic
To: n/aView DetailsDetails
- US 730/4.1 Miles N of Oregon Border - Rockfall Pr.
Safety: Rockfall Prevention
Project Sponsor: WSDOT
Safety Focus: Safety
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $493,637
Plan Phase: Funded - in progress
Future Cost: $493,637
From: Twin Sisters Vic
To: n/aView DetailsDetails
- US 730/4.4 Miles N of Oregon Border - Rockfall Pr.
Safety: Rockfall Prevention
Project Sponsor: WSDOT
Safety Focus: Safety
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $2,569,239
Plan Phase: Funded - in progress
Future Cost: $2,569,239
From: Twin Sisters Vic
To: n/aView DetailsDetails
- US 730/5.2 Miles N of Oregon Border - Rockfall Pr.
Safety: Rockfall Prevention
Project Sponsor: WSDOT
Safety Focus: Safety
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $1,107,864
Plan Phase: Funded - in progress
Future Cost: $1,107,864
From: Wallula Jct. Vic
To: n/aView DetailsDetails
B1. Projects for persons with disabilities (Americans with Disabilities Act [ADA]) // Proyectos para personas con discapacidades
- Audible Accessible signal Improvements
Ped/Bike: Improvements for Persons with Disabilit*
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Audible Accessible Signal
Bicycle: -
Vehicle Capacity: -
Current Cost: $350,000
Plan Phase: Long-term 2036-2045
Future Cost: $844,100
From: Various
To: VariousView DetailsDetails
- Main-Palouse-Boyer Intersection Accessibility
Ped/Bike: Improvements for Persons with Disabilit*
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: -
Current Cost: $100,000
Plan Phase: Long-term 2036-2045
Future Cost: $241,200
From: n/a
To: n/aView DetailsDetails
- SR 125 Spur/N 13th Ave to Myra Rd - ADA
Ped/Bike: Improvements for Persons with Disabilit*
Project Sponsor: WSDOT
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: -
Vehicle Capacity: -
Current Cost: $116,790
Plan Phase: Long-term 2036-2045
Future Cost: $281,700
From: N 13th Ave
To: Myra RdView DetailsDetails
- SR 125/Military Rd to N 13th Ave - ADA
Ped/Bike: Improvements for Persons with Disabilit*
Project Sponsor: WSDOT
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: -
Vehicle Capacity: -
Current Cost: $1,063,930
Plan Phase: Long-term 2036-2045
Future Cost: $2,565,900
From: Military Rd
To: N 13th AveView DetailsDetails
- SR 125/OR Stateline to Military Rd - ADA
Ped/Bike: Improvements for Persons with Disabilit*
Project Sponsor: WSDOT
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: -
Vehicle Capacity: -
Current Cost: $629,425
Plan Phase: Funded - in progress
Future Cost: $629,425
From: Stateline
To: Military RdView DetailsDetails
B2. Pedestrians and bicycles projects // Proyectos para peatones y ciclistas
- Mill Creek Trail Re-Pave
Ped/Bike: Pedestrian and Bicycle Improvements
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Multi-use Path 10+ ft
Bicycle: Off-road Path
Vehicle Capacity: -
Current Cost: $150,000
Plan Phase: Long-term 2036-2045
Future Cost: $361,800
From: Cambridge
To: TausickView DetailsDetails
- Park Street Bike and Pedestrian
Ped/Bike: Pedestrian and Bicycle Improvements
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Buffered Sidewalk
Bicycle: Bikelane
Vehicle Capacity: -
Current Cost: $400,000
Plan Phase: Short-term 2021-2025
Future Cost: $436,800
From: Boyer
To: AlderView DetailsDetails
- SR 125 Walla Walla Vic - Active Transp. Improve.
Ped/Bike: Pedestrian and Bicycle Improvements
Project Sponsor: WSDOT
Safety Focus: -
Pedestrian: Multi-use Path 10+ ft
Bicycle: -
Vehicle Capacity: -
Current Cost: $1,500,000
Plan Phase: Medium-term 2026-2035
Future Cost: $2,329,500
From: n/a
To: n/aView DetailsDetails
- SW 4th 4Bikes Project
Ped/Bike: Bicycle Improvements
Project Sponsor: College Place
Safety Focus: Previous Injury Location
Pedestrian: Curb-tight Sidewalk
Bicycle: Buffered Bikelane
Vehicle Capacity: -
Current Cost: $866,000
Plan Phase: Funded - in progress
Future Cost: $866,000
From: College Avenue
To: Academy WayView DetailsDetails
B3. Pedestrian infrastructure projects // Proyectos de infraestructura peatonal
- Abbott Road MP 0.25 to MP 0.50
Ped/Bike: Pedestrian Improvements
Project Sponsor: Walla Walla County
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: -
Vehicle Capacity: -
Current Cost: $208,548
Plan Phase: Funded - in progress
Future Cost: $208,548
From: 0.25
To: 0.5View DetailsDetails
- Bryant Avenue Sidewalks
Ped/Bike: Pedestrian Improvements
Project Sponsor: WW Cty/Cnty -- WW
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: -
Current Cost: $1,000,000
Plan Phase: Long-term 2036-2045
Future Cost: $2,411,700
From: Division
To: SchoolView DetailsDetails
- Citywide Pedestrian Safety Treatments
Ped/Bike: Pedestrian Improvements
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: -
Vehicle Capacity: -
Current Cost: $393,845
Plan Phase: Funded - in progress
Future Cost: $393,845
From: Various
To: VariousView DetailsDetails
- College Avenue CP Post Office Ped Crossing
Ped/Bike: Pedestrian Improvements
Project Sponsor: College Place
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: -
Current Cost: $90,000
Plan Phase: Short-term 2021-2025
Future Cost: $98,300
From: Fourth Street
To: Sixth StreetView DetailsDetails
- 4 years 6 months ago
-
Anonymous
This project is desperately needed. I have witnessed several pedestrians come close to getting hit by traffic at this crossing due to the limited visibility.
- Cottonwood Road sidewalks and Pedestrian Bridge
Ped/Bike: Pedestrian Improvements
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Multi-use Path 10+ ft
Bicycle: Bikelane
Vehicle Capacity: -
Current Cost: $400,000
Plan Phase: Long-term 2036-2045
Future Cost: $964,700
From: Thunder Ridge
To: Russell CreekView DetailsDetails
- Plaza Way Sidewalks
Ped/Bike: Pedestrian Improvements
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: -
Current Cost: $500,000
Plan Phase: Medium-term 2026-2035
Future Cost: $776,500
From: Village Way
To: TaumarsonView DetailsDetails
- School Ave. Sidewalks
Ped/Bike: Pedestrian Improvements
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: -
Current Cost: $875,000
Plan Phase: Long-term 2036-2045
Future Cost: $2,110,200
From: Pleasant
To: Woodmere LpView DetailsDetails
- Sidewalks: Harmon St, 2nd St, Garden St, Camp Rd
Ped/Bike: Pedestrian Improvements
Project Sponsor: Waitsburg
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: -
Vehicle Capacity: -
Current Cost: $250,000
Plan Phase: Medium-term 2026-2035
Future Cost: $388,200
From: Various
To: VariousView DetailsDetails
- SR 125/Plaza Way Vic Stage 2 - Sidewalk Improve.
Ped/Bike: Pedestrian Improvements
Project Sponsor: WSDOT
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: -
Vehicle Capacity: -
Current Cost: $211,300
Plan Phase: Funded - in progress
Future Cost: $211,300
From: Plaza Way: 4.4
To: Orchard: 4.7View DetailsDetails
- 4 years 6 months ago
-
Andrew Pryor
Absent a 9th Ave pedestrian crossing for 1800+’ with presence of multiple pedestrian traffic generators demonstrates a failure of WSDOT project delivery in Walla Walla Valley.
- Tietan Street Sidewalks - 4th to Plaza
Ped/Bike: Pedestrian Improvements
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: -
Current Cost: $880,000
Plan Phase: Medium-term 2026-2035
Future Cost: $1,366,600
From: 4th
To: PlazaView DetailsDetails
- 4 years 6 months ago
-
Anonymous
Should be easy to finish the sidewalk on the south side of Tietan, most of it already has sidewalk.
C1. Intersection projects // Proyecto de intersecciones
- 12th Street and Larch Intersection
Intersection: Reconstruction
Project Sponsor: College Place
Safety Focus: Previous Fatality Location
Pedestrian: Curb-tight Sidewalk
Bicycle: Off-road Path
Vehicle Capacity: New Roundabout or Traffic Signal
Current Cost: $1,600,000
Plan Phase: Medium-term 2026-2035
Future Cost: $2,484,800
From: 12th/Larch
To: 12th/LarchView DetailsDetails
- 9th and Alder Signal Replacement
Intersection: Signal Replacement
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $450,000
Plan Phase: Medium-term 2026-2035
Future Cost: $698,800
From: n/a
To: n/aView DetailsDetails
- 9th and Pine Signalization
Intersection: Traffic Signal
Project Sponsor: Walla Walla
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: New Traffic Light
Current Cost: $350,000
Plan Phase: Long-term 2036-2045
Future Cost: $844,100
From: n/a
To: n/aView DetailsDetails
- 4 years 6 months ago
-
Anonymous
I wouldn't mind if this were an all-way stop sooner. Same for 13th and Pine.
- 9th Ave and Main Signal
Intersection: Signal Replacement
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $450,000
Plan Phase: Medium-term 2026-2035
Future Cost: $698,800
From: n/a
To: n/aView DetailsDetails
- Alder Street - Roosevelt to Brock
Intersection: Reconstruction
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: -
Current Cost: $3,413,000
Plan Phase: Medium-term 2026-2035
Future Cost: $5,300,300
From: Roosevelt
To: BrockView DetailsDetails
- C Street and Myra Rd Intersection
Intersection: Improvement
Project Sponsor: College Place
Safety Focus: Hotspot for Property Damage Crashes
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: -
Current Cost: $25,000
Plan Phase: Medium-term 2026-2035
Future Cost: $38,800
From: Deccio Rd
To: Myra RdView DetailsDetails
- Central Business Dist. Signal Interconnect
Intersection: Signal Interconnect
Project Sponsor: Walla Walla
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: New Traffic Light
Current Cost: $150,000
Plan Phase: Long-term 2036-2045
Future Cost: $361,800
From: various
To: variousView DetailsDetails
- 4 years 6 months ago
-
Anonymous
I'd like to see Rose, Main, Alder, and Poplar be one-way streets. The east end is practically built for it. Maybe it can go out to 11th. This will relieve traffic congestion downtown.
- Central Business Dist. Signal Upgrade
Intersection: Technology Upgrade
Project Sponsor: Walla Walla
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $150,000
Plan Phase: Long-term 2036-2045
Future Cost: $361,800
From: various
To: variousView DetailsDetails
- Chestnut and Howard Intersection Improvement
Intersection: Improvement
Project Sponsor: Walla Walla
Safety Focus: Previous Injury Location
Pedestrian: Buffered Sidewalk
Bicycle: Bikelane
Vehicle Capacity: New Traffic Light
Current Cost: $1,000,000
Plan Phase: Medium-term 2026-2035
Future Cost: $1,553,000
From: Maple
To: LocustView DetailsDetails
- 4 years 5 months ago
-
Anonymous
Traffic circle should be built here. Pedestrian cross walks need to be installed across Howard. Howard traffic does not stop for pedestrians even if they are standing in the bike lanes.
- College Avenue - Southside Dev. Intersection I
Intersection: Reconstruction
Project Sponsor: College Place
Safety Focus: Prevent Roadway Departure
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: New Traffic Light
Current Cost: $365,170
Plan Phase: Medium-term 2026-2035
Future Cost: $567,100
From: College Place High School
To: College Place High SchoolView DetailsDetails
- College Avenue - Southside Dev. Intersection II
Intersection: Reconstruction
Project Sponsor: College Place
Safety Focus: Prevent Roadway Departure
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: New Traffic Light
Current Cost: $365,170
Plan Phase: Medium-term 2026-2035
Future Cost: $567,100
From: Sager Middle School
To: Sager Middle SchoolView DetailsDetails
- Howard and Reser Signalization
Intersection: Traffic Signal
Project Sponsor: Walla Walla
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: New Traffic Light
Current Cost: $350,000
Plan Phase: Long-term 2036-2045
Future Cost: $844,100
From: n/a
To: n/aView DetailsDetails
- Myra/Garrison Village Way Signal
Intersection: Traffic Signal
Project Sponsor: Walla Walla/College Place -- WW
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Path 8+ ft
Bicycle: Off-road Path
Vehicle Capacity: New Traffic Light
Current Cost: $2,200,000
Plan Phase: Long-term 2036-2045
Future Cost: $5,305,800
From: n/a
To: n/aView DetailsDetails
- 4 years 6 months ago
-
Anonymous
A safe crossing is needed to connect Regency/Villages at Garrison Creek with Fort Walla Walla park. Many people cross the street here and it is dangerous.
- School Avenue and Pleasant Street Realignment
Intersection: Improvement
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: -
Current Cost: $965,000
Plan Phase: Medium-term 2026-2035
Future Cost: $1,498,600
From: Amelia
To: CarlView DetailsDetails
- SR 125/Plaza Way - Intersection Improvements
Intersection: Reconstruction
Project Sponsor: WSDOT
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: -
Vehicle Capacity: New Roundabout
Current Cost: $2,385,776
Plan Phase: Funded - in progress
Future Cost: $2,385,776
From: 4.3
To: 4.65View DetailsDetails
- 4 years 6 months ago
-
Terry Rice
I like the round about idea! I'm wondering if research could be done to add extra lane from Hwy 11 direct to Plaza Way in addition to what is proposed? It could merge with the other lane after it wraps around Starbucks. Lots of vehicles have to turn from there coming from College Place and M-F.
- Wallula Avenue MP 2.00 to MP 2.20
Intersection: Reconstruction
Project Sponsor: Walla Walla County
Safety Focus: Hotspot for Property Damage Crashes
Pedestrian: Curb-tight Sidewalk
Bicycle: -
Vehicle Capacity: New Roundabout
Current Cost: $724,943
Plan Phase: Funded - in progress
Future Cost: $724,943
From: 2
To: 2.2View DetailsDetails
- Whitman Drive and Larch Intersection
Intersection: Reconstruction
Project Sponsor: College Place
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: New Traffic Light
Current Cost: $304,160
Plan Phase: Medium-term 2026-2035
Future Cost: $472,400
From: Larch Avenue
To: Whitman DriveView DetailsDetails
C2. New construction projects // Nuevos proyectos de construcción
- Myra Rd - SR 125 to Taumarson
New: Construction
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Buffered Sidewalk
Bicycle: Bikelane
Vehicle Capacity: Increase in Lanes
Current Cost: $9,000,000
Plan Phase: Medium-term 2026-2035
Future Cost: $13,976,700
From: SR 125
To: TaumarsonView DetailsDetails
- 4 years 6 months ago
-
Anonymous
It might be interesting if this was extended to become a freeway to Milton-Freewater. Current WA-125/OR-11 is dangerous, and one roundabout won't fix problems on the entire 10-mile corridor.
- 4 years 6 months ago
-
Anonymous
This really should be done before the roundabout at 9th/plaza/Dalles Military Road. Would help with detour traffic!
- Taggart Road Extension
New: Construction
Project Sponsor: Waitsburg
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: Increase in Lanes
Current Cost: $270,000
Plan Phase: Funded - in progress
Future Cost: $270,000
From: Mill Race
To: Highway 12View DetailsDetails
- US 12/Wallula to Nine Mile Hill - P8: PE-RW Phases
New: Design and Right-of-Way
Project Sponsor: WSDOT
Safety Focus: Previous Fatality Location
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: Increase in Lanes
Current Cost: $21,800,000
Plan Phase: Funded - in progress
Future Cost: $21,800,000
From: Wallula
To: Nine Mile HillView DetailsDetails
D1. Bridge rehabilitation and replacement projects // Proyectos de rehabilitación y reemplazo de puentes
- 2nd Ave. Bridge over Mill Creek
Bridge: Replacement
Project Sponsor: Walla Walla
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $1,500,000
Plan Phase: Long-term 2036-2045
Future Cost: $3,617,600
From: n/a
To: n/aView DetailsDetails
- 3RD AVENUE S. PAXTON BRIDGE MP 2.30 TO MP 2.77
Bridge: Replacement and Road Reconstruction
Project Sponsor: Walla Walla County
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $900,000
Plan Phase: Medium-term 2026-2035
Future Cost: $1,397,700
From: 2.3
To: 2.77View DetailsDetails
- Arch Bridge on Lamar Road, MP 2.64 to MP 2.94
Bridge: Replacement
Project Sponsor: Walla Walla County
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $1,451,800
Plan Phase: Funded - in progress
Future Cost: $1,451,800
From: 2.64
To: 2.94View DetailsDetails
- Dell Sharpe Bridge, Pettyjohn Rd, MP 5.2 to MP 5.8
Bridge: Replacement
Project Sponsor: Walla Walla County
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $7,231,250
Plan Phase: Funded - in progress
Future Cost: $7,231,250
From: 5.2
To: 5.8View DetailsDetails
- Drumheller Bridge, Sudbury Rd, MP 3.99 to MP 4.09
Bridge: Rehabilitation
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $956,250
Plan Phase: Funded - in progress
Future Cost: $956,250
From: 3.99
To: 4.09View DetailsDetails
- Rose Street Bridge Replacement at Mill Creek
Bridge: Replacement
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: -
Vehicle Capacity: -
Current Cost: $4,026,660
Plan Phase: Funded - in progress
Future Cost: $4,026,660
From: Intersection
To: IntersectionView DetailsDetails
- US 12/US 12 Over Abandoned Railroad - Bridge Pain.
Bridge: Painting
Project Sponsor: WSDOT
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $1,245,723
Plan Phase: Funded - in progress
Future Cost: $1,245,723
From: Wallula Jct. Vic
To: n/aView DetailsDetails
- US 12/Walla Walla River Bridge - Bridge Painting
Bridge: Painting
Project Sponsor: WSDOT
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $3,164,997
Plan Phase: Funded - in progress
Future Cost: $3,164,997
From: Wallula Jct. Vic
To: n/aView DetailsDetails
- WALLULA AVENUE MP 0.00 TO MP 0.25
Bridge: Replacement
Project Sponsor: Walla Walla County
Safety Focus: -
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $2,000,000
Plan Phase: Medium-term 2026-2035
Future Cost: $3,105,900
From: 0
To: 0.25View DetailsDetails
D2. Paving projects // Proyectos de pavimentación
- 9th Ave/Plaza Way/Dalles Military Improvements
Paving and Lane Changes
Project Sponsor: Walla Walla
Safety Focus: Previous Injury Location
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: Reduction in Number of Lanes
Current Cost: $2,390,000
Plan Phase: Funded - in progress
Future Cost: $2,390,000
From: 9th Ave
To: Village WayView DetailsDetails
- Asphalt/Chip Seal Preservation WWV
Paving
Project Sponsor: WSDOT
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $12,766,386
Plan Phase: Funded - in progress
Future Cost: $12,766,386
From: Various
To: VariousView DetailsDetails
- Fishook Park Road MP 0.00 to MP 1.40
Paving and Widened Shoulder
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $1,371,550
Plan Phase: Funded - in progress
Future Cost: $1,371,550
From: 0
To: 1.4View DetailsDetails
- SR 125 Spur/N 13th Ave to Myra Rd - Paving
Paving
Project Sponsor: WSDOT
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $466,650
Plan Phase: Medium-term 2026-2035
Future Cost: $724,700
From: N 13th Ave
To: Myra RdView DetailsDetails
- SR 125/Military Rd to N 13th Ave - Paving
Paving
Project Sponsor: WSDOT
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $1,663,950
Plan Phase: Medium-term 2026-2035
Future Cost: $2,584,100
From: Military Rd
To: N 13th AveView DetailsDetails
- SR 125/OR Stateline to Military Rd - Paving
Paving
Project Sponsor: WSDOT
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $5,519,586
Plan Phase: Funded - starting soon
Future Cost: $5,519,586
From: Stateline
To: Military RdView DetailsDetails
- US 12/Dodd Rd Vicinity to Wallula Vic. - Paving
Paving
Project Sponsor: WSDOT
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $2,378,000
Plan Phase: Funded - starting soon
Future Cost: $2,378,000
From: Dodd Rd Vic
To: Wallula VicView DetailsDetails
- US 730/Oregon State Line to US 12 - Paving
Paving
Project Sponsor: WSDOT
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: -
Current Cost: $2,947,770
Plan Phase: Funded - starting soon
Future Cost: $2,947,770
From: Oregon State line
To: US 12View DetailsDetails
D3. Reconstruction projects // Proyectos de reconstrucción
- 12th Street Reconstruction: Larch to College Ave.
Roadway: Reconstruction
Project Sponsor: College Place
Safety Focus: Previous Fatality Location
Pedestrian: Multi-use Path 10+ ft
Bicycle: Off-road Path
Vehicle Capacity: -
Current Cost: $2,858,200
Plan Phase: Medium-term 2026-2035
Future Cost: $4,438,700
From: College Avenue
To: Larch AvenueView DetailsDetails
- 4 years 6 months ago
-
Anonymous
SE 12th Street needs to be reconstructed bad. Several incidents along road make it feel unsafe such as the lady that got hit by a car and died at 12th/Sky as well as limited lighting and the driveby shooting that occurred at 12th/Date. Better lighting and bike facilities are needed.
- 12th Street Reconstruction: Larch to Myra
Roadway: Reconstruction
Project Sponsor: College Place
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Off-road Path
Vehicle Capacity: -
Current Cost: $4,045,800
Plan Phase: Medium-term 2026-2035
Future Cost: $6,283,000
From: Larch Avenue
To: Myra RdView DetailsDetails
- A Street Reconstruction
Roadway: Reconstruction
Project Sponsor: Prescott
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: -
Vehicle Capacity: -
Current Cost: $450,000
Plan Phase: Medium-term 2026-2035
Future Cost: $698,800
From: 1st Street
To: Front StreetView DetailsDetails
- Alder and Poplar Street-Merriam to Colville
Roadway: Reconstruction and Lane Changes
Project Sponsor: Walla Walla
Safety Focus: Previous Injury Location
Pedestrian: Curb-tight Sidewalk
Bicycle: Buffered Bikelane
Vehicle Capacity: -
Current Cost: $4,270,000
Plan Phase: Short-term 2021-2025
Future Cost: $4,662,900
From: Merriam
To: ColvilleView DetailsDetails
- Avery Street Improvements
Roadway: Reconstruction
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Buffered Sidewalk
Bicycle: Bikelane
Vehicle Capacity: -
Current Cost: $1,500,000
Plan Phase: Medium-term 2026-2035
Future Cost: $2,329,500
From: Rose
To: ElectricView DetailsDetails
- BEET ROAD MP 0.71 TO MP 1.41
Roadway: Realignment
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $940,000
Plan Phase: Long-term 2036-2045
Future Cost: $2,267,000
From: 0.71
To: 1.41View DetailsDetails
- Chestnut Street 2nd to Howard
Roadway: Reconstruction
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Buffered Sidewalk
Bicycle: Bikelane
Vehicle Capacity: -
Current Cost: $3,300,000
Plan Phase: Medium-term 2026-2035
Future Cost: $5,124,800
From: 2nd
To: HowardView DetailsDetails
- Clinton Street Reconstruction
Roadway: Reconstruction
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Buffered Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: -
Current Cost: $2,500,000
Plan Phase: Long-term 2036-2045
Future Cost: $6,029,300
From: Isaacs
To: AlderView DetailsDetails
- 4 years 6 months ago
-
Anonymous
If Clinton is getting more open access at US12, this road needs to be wider or have parking restrictions.
- 4 years 5 months ago
-
Bryan Lubbers
So, some of the oldest trees in the city, and long lived ones as well, all sacrificed for traffic 'safety'. Traffic moves slowly on Clinton *because* of the narrowness. Widening that roadway will speed up traffic, endanger users, and wreck a lovely canopied street all at the same time. Pls rethink
- FISHHOOK PARK ROAD MP 1.40 TO MP 2.92
Roadway: Realignment
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $800,000
Plan Phase: Medium-term 2026-2035
Future Cost: $1,242,400
From: 1.4
To: 2.92View DetailsDetails
- HARVEY SHAW ROAD MP 0.03 TO MP 2.00
Roadway: Realignment
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $1,000,000
Plan Phase: Medium-term 2026-2035
Future Cost: $1,553,000
From: 0.03
To: 2View DetailsDetails
- HARVEY SHAW ROAD MP 2.00 TO MP 3.35
Roadway: Reconstruction and Realignment
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $60,000
Plan Phase: Medium-term 2026-2035
Future Cost: $93,200
From: 2
To: 3.35View DetailsDetails
- 4 years 6 months ago
-
Anonymous
If "realignment" means "straightening", then straightening generally seems unnecessary. I like the idea of adding a lane for bicyclists, but cutting a new path for an entire road to get it seems unnecessary and costly.
- HARVEY SHAW ROAD MP 5.43 TO MP 8.05
Roadway: Realignment
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $1,600,000
Plan Phase: Medium-term 2026-2035
Future Cost: $2,484,800
From: 5.43
To: 8.05View DetailsDetails
- Howard Street - Park to Tietan
Roadway: Reconstruction
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Buffered Sidewalk
Bicycle: Bikelane
Vehicle Capacity: -
Current Cost: $5,209,000
Plan Phase: Long-term 2036-2045
Future Cost: $12,562,600
From: Park
To: TietanView DetailsDetails
- LEWIS PEAK ROAD MP 0.00 TO MP 9.24
Roadway: Reconstruction and Realignment
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $1,600,000
Plan Phase: Long-term 2036-2045
Future Cost: $3,858,700
From: 0
To: 9.24View DetailsDetails
- LOWER WAITSBURG ROAD MP 13.50 TO MP 14.78
Roadway: Realignment
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $1,570,000
Plan Phase: Long-term 2036-2045
Future Cost: $3,786,400
From: 13.5
To: 14.78View DetailsDetails
- Lower Waitsburg Road MP 4.23 to MP 6.25
Roadway: Reconstruction and Realignment
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $2,554,000
Plan Phase: Funded - in progress
Future Cost: $2,554,000
From: 4.23
To: 6.25View DetailsDetails
- LYONS FERRY ROAD MP 0.20 TO MP 2.81
Roadway: Realignment
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $2,950,000
Plan Phase: Medium-term 2026-2035
Future Cost: $4,581,300
From: 0.2
To: 2.81View DetailsDetails
- MCKAY ALTO ROAD MP 0.00 TO MP 1.28
Roadway: Reconstruction
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $750,000
Plan Phase: Medium-term 2026-2035
Future Cost: $1,164,700
From: 0
To: 1.28View DetailsDetails
- Melrose Street Reconstruction
Roadway: Reconstruction
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: -
Current Cost: $1,500,000
Plan Phase: Long-term 2036-2045
Future Cost: $3,617,600
From: Wilbur
To: Airport WayView DetailsDetails
- MIDDLE WAITSBURG ROAD MP 11.65 TO MP 13.0
Roadway: Reconstruction and Realignment
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $2,080,000
Plan Phase: Long-term 2036-2045
Future Cost: $5,016,400
From: 11.65
To: 13View DetailsDetails
- MIDDLE WAITSBURG ROAD MP 14.40 TO MP 16.41
Roadway: Reconstruction
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $1,000,000
Plan Phase: Medium-term 2026-2035
Future Cost: $1,553,000
From: 14.4
To: 16.41View DetailsDetails
- Middle Waitsburg Road MP 6.10 to MP 7.92: 2017SP
Roadway: Reconstruction and Realignment
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $2,400,000
Plan Phase: Funded - in progress
Future Cost: $2,400,000
From: 6.1
To: 7.92View DetailsDetails
- Mill Creek Road MP 1.10 to MP 3.96
Roadway: Reconstruction and Realignment
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $3,210,000
Plan Phase: Funded - in progress
Future Cost: $3,210,000
From: 1.1
To: 3.96View DetailsDetails
- MILL CREEK ROAD MP 6.5 TO MP 8.0
Roadway: Reconstruction
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $2,100,000
Plan Phase: Long-term 2036-2045
Future Cost: $5,064,600
From: 6.5
To: 8View DetailsDetails
- Mill Race Rd Grade Crossing
Roadway: Reconstruction
Project Sponsor: Waitsburg
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: -
Vehicle Capacity: -
Current Cost: $583,403
Plan Phase: Funded - in progress
Future Cost: $583,403
From: Main Street
To: City LimitsView DetailsDetails
- MOJONNIER ROAD MP 0.14 TO MP 1.40
Roadway: Realignment
Project Sponsor: Walla Walla County
Safety Focus: Safety
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $1,000,000
Plan Phase: Medium-term 2026-2035
Future Cost: $1,553,000
From: 0.14
To: 1.4View DetailsDetails
- Mojonnier Road Reconstruction: CN Phase
Roadway: Reconstruction
Project Sponsor: College Place
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Multi-use Path 10+ ft
Bicycle: Off-road Path
Vehicle Capacity: New Center Turn Lane
Current Cost: $5,452,900
Plan Phase: Medium-term 2026-2035
Future Cost: $8,468,200
From: College Avenue
To: Bluvue LaneView DetailsDetails
- Mojonnier Road Reconstruction: PE-RW Phases
Roadway: Design and Right-of-Way
Project Sponsor: College Place
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Multi-use Path 10+ ft
Bicycle: Off-road Path
Vehicle Capacity: New Center Turn Lane
Current Cost: $711,000
Plan Phase: Funded - in progress
Future Cost: $711,000
From: College Avenue
To: Bluvue LaneView DetailsDetails
- MUD CREEK ROAD MP 3.00 TO MP 3.50
Roadway: Realignment
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $470,000
Plan Phase: Long-term 2036-2045
Future Cost: $1,133,500
From: 3
To: 3.5View DetailsDetails
- Park Street Improvements
Roadway: Reconstruction
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Buffered Sidewalk
Bicycle: Bikelane
Vehicle Capacity: -
Current Cost: $3,300,000
Plan Phase: Medium-term 2026-2035
Future Cost: $5,124,800
From: Alder
To: JuniperView DetailsDetails
- Peppers Bridge Road MP 0.36 to MP 1.61
Roadway: Reconstruction
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $1,700,000
Plan Phase: Funded - in progress
Future Cost: $1,700,000
From: 0.36
To: 1.61View DetailsDetails
- Plaza Way - Village to Taumarson
Roadway: Reconstruction
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: -
Current Cost: $4,500,000
Plan Phase: Medium-term 2026-2035
Future Cost: $6,988,400
From: Village Way
To: TaumarsonView DetailsDetails
- Poplar Street - 5th to 14th
Roadway: Reconstruction and Lane Changes
Project Sponsor: Walla Walla
Safety Focus: Previous Injury Location
Pedestrian: Buffered Sidewalk
Bicycle: Buffered Bikelane
Vehicle Capacity: Reduction in Number of Lanes
Current Cost: $4,500,000
Plan Phase: Medium-term 2026-2035
Future Cost: $6,988,400
From: 5th
To: 14thView DetailsDetails
- Poplar Street - Colville to 5th
Roadway: Reconstruction and Lane Changes
Project Sponsor: Walla Walla
Safety Focus: Previous Injury Location
Pedestrian: Buffered Sidewalk
Bicycle: Buffered Bikelane
Vehicle Capacity: Reduction in Number of Lanes
Current Cost: $3,299,775
Plan Phase: Funded - in progress
Future Cost: $3,299,775
From: Colville
To: 5thView DetailsDetails
- 4 years 6 months ago
-
Chaplain Terence Rice
Can we switch the lighting system to favor traffic flow that reinforces the speed limit, instead of intentional stopping of traffic flow? Traffic lights to start from Park Avenue to 9th Street could turn in sync with traffic flow timed with the speed limit will reduce gas emissions and improve time.
- Poplar Street 14th to Myra
Roadway: Reconstruction
Project Sponsor: Walla Walla
Safety Focus: Previous Injury Location
Pedestrian: Buffered Sidewalk
Bicycle: Buffered Bikelane
Vehicle Capacity: Reduction in Number of Lanes
Current Cost: $1,600,000
Plan Phase: Long-term 2036-2045
Future Cost: $3,858,700
From: 14th
To: MyraView DetailsDetails
- RESER ROAD MP 0.49 TO MP 0.97: Fern to Wilbur
Roadway: Reconstruction
Project Sponsor: Walla Walla County
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Path 8+ ft
Bicycle: Bikelane
Vehicle Capacity: -
Current Cost: $1,680,000
Plan Phase: Long-term 2036-2045
Future Cost: $4,051,700
From: 0.49
To: 0.97View DetailsDetails
- RESER ROAD MP 0.97 TO MP 1.22
Roadway: Reconstruction
Project Sponsor: Walla Walla County
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $1,170,000
Plan Phase: Medium-term 2026-2035
Future Cost: $1,817,000
From: 0.97
To: 1.22View DetailsDetails
- RESER ROAD MP 3.29 TO MP 5.19
Roadway: Realignment
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $1,080,000
Plan Phase: Medium-term 2026-2035
Future Cost: $1,677,200
From: 3.29
To: 5.19View DetailsDetails
- School Avenue Improvements Alder to Bryant
Roadway: Reconstruction
Project Sponsor: WW Cty/Cnty -- WW
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: -
Current Cost: $2,000,000
Plan Phase: Long-term 2036-2045
Future Cost: $4,823,400
From: Alder
To: BryantView DetailsDetails
- SCHOOL AVENUE MP 0.00 TO MP 1.11
Roadway: Reconstruction
Project Sponsor: Walla Walla County
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: -
Current Cost: $2,400,000
Plan Phase: Medium-term 2026-2035
Future Cost: $3,727,100
From: 0
To: 1.11View DetailsDetails
- STOVALL ROAD MP 0.90 TO MP 2.00
Roadway: Realignment
Project Sponsor: Walla Walla County
Safety Focus: Prevent Roadway Departure
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $1,070,000
Plan Phase: Long-term 2036-2045
Future Cost: $2,580,500
From: 0.9
To: 2View DetailsDetails
- WALLULA AVENUE MP 0.25 TO MP 1.84
Roadway: Reconstruction
Project Sponsor: Walla Walla County
Safety Focus: Safety
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $900,000
Plan Phase: Medium-term 2026-2035
Future Cost: $1,397,700
From: 0.25
To: 1.84View DetailsDetails
- 4 years 5 months ago
-
Anonymous
Much needed; very narrow road, especially under poor conditions. Thanks!
E1. Future intersection, not yet funded // Intersección futura, aún no financiada
- College Avenue and State Route 125 Improvement
Future Thoroughfare: Intersection Improvements
Project Sponsor: College Place
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: New Roundabout
Current Cost: $2,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Sager Middle School
To: State Route 125View DetailsDetails
- OR 11/Ferndale
Future Thoroughfare: Intersection Improvements
Project Sponsor: ODOT
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: New Roundabout
Current Cost: $2,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Ferndale Rd
To: Ferndale RdView DetailsDetails
- OR 11/SW 2nd Ave/Main St
Future Thoroughfare: Intersection Improvements
Project Sponsor: ODOT
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: -
Vehicle Capacity: New Roundabout
Current Cost: $2,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: SW 2nd Ave
To: Main StView DetailsDetails
- OR 11/Umapine Highway - SR 332
Future Thoroughfare: Intersection Improvements
Project Sponsor: ODOT
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: New Roundabout
Current Cost: $2,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Umapine Highway
To: Umapine HighwayView DetailsDetails
- SR 124/S Lake Rd: RTPO boundary line
Future Thoroughfare: Intersection Improvements
Project Sponsor: WSDOT
Safety Focus: Hotspot for Property Damage Crashes
Pedestrian: -
Bicycle: -
Vehicle Capacity: New Roundabout
Current Cost: $2,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Janell Ln
To: Tuttle LnView DetailsDetails
- SR 125/Meadowbrook
Future Thoroughfare: Intersection Improvements
Project Sponsor: WSDOT
Safety Focus: Previous Injury Location
Pedestrian: Curb-tight Sidewalk
Bicycle: -
Vehicle Capacity: New Roundabout
Current Cost: $5,500,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Meadowbrook St
To: Meadowbrook StView DetailsDetails
- SR 125/Myra
Future Thoroughfare: Intersection Improvements
Project Sponsor: WSDOT
Safety Focus: Previous Injury Location
Pedestrian: Multi-use Path 10+ ft
Bicycle: -
Vehicle Capacity: New Roundabout
Current Cost: $5,500,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Myra Rd
To: Myra RdView DetailsDetails
- SR 125/Old Milton Highway
Future Thoroughfare: Intersection Improvements
Project Sponsor: WSDOT
Safety Focus: Previous Fatality Location
Pedestrian: -
Bicycle: -
Vehicle Capacity: New Roundabout
Current Cost: $5,500,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Old Milton Highway
To: Old Milton HighwayView DetailsDetails
- 4 years 5 months ago
-
Anonymous
Really good idea, visibility + traffic speed make this signal dangerous
- SR 125/Stateline Road
Future Thoroughfare: Intersection Improvements
Project Sponsor: WSDOT
Safety Focus: Previous Injury Location
Pedestrian: -
Bicycle: -
Vehicle Capacity: New Roundabout
Current Cost: $5,500,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Stateline Rd
To: Stateline RdView DetailsDetails
- 4 years 5 months ago
-
Anonymous
Highest priority of the Hwy 11 projects shown
- US 12/Clinton Ave: Interchange
Future Thoroughfare: Interchange
Project Sponsor: WSDOT -- WW
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: Grade Separation
Current Cost: $35,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Clinton St
To: Clinton StView DetailsDetails
- 4 years 6 months ago
-
Anonymous
Only 1/2 mile of Clinton south of US12 has a centerline. Any traffic going to Boyer or Alder will have difficulty getting through on such a narrow road. If Myra can be extended nearly a mile north of Rose to meet US12, why can't Wilbur be extended 1/3 mile to Middle Waitsburg Road?
- US 12/Clinton St: Roundabout
Future Thoroughfare: Intersection Improvements
Project Sponsor: WSDOT
Safety Focus: Previous Fatality Location
Pedestrian: Curb-tight Path 8+ ft
Bicycle: Signed/Shared Route
Vehicle Capacity: New Roundabout
Current Cost: $11,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Clinton St
To: Clinton StView DetailsDetails
- 4 years 6 months ago
-
Anonymous
This is the busiest corridor between the bridges at Burbank and Clarkston. Signs say "freeway entrance". Freeways don't have roundabouts. Forcing semis and motorcycles to slow at a blind corner for a random roundabout is a safety hazard, especially if pedestrians and bicycles cross at-grade
- 4 years 5 months ago
-
Anonymous
A roundabout is a dumb idea. Period.
- US 12/SR 124
Future Thoroughfare: Intersection Improvements
Project Sponsor: WSDOT
Safety Focus: Hotspot for Property Damage Crashes
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: New Roundabout
Current Cost: $2,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Coppei Ave
To: Preston AveView DetailsDetails
- US 12/Wilbur Ave: Interchange
Future Thoroughfare: Interchange
Project Sponsor: WSDOT
Safety Focus: Previous Fatality Location
Pedestrian: Curb-tight Path 8+ ft
Bicycle: Signed/Shared Route
Vehicle Capacity: Grade Separation
Current Cost: $35,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Wilbur Ave
To: Wilbur AveView DetailsDetails
- US 12/Wilbur Ave: Roundabout
Future Thoroughfare: Intersection Improvements
Project Sponsor: WSDOT
Safety Focus: Previous Fatality Location
Pedestrian: Curb-tight Path 8+ ft
Bicycle: Signed/Shared Route
Vehicle Capacity: New Roundabout
Current Cost: $11,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Wilbur Ave
To: Wilbur AveView DetailsDetails
- 4 years 5 months ago
-
Anonymous
No roundabouts on freeways! Doesn't take an engineer to see so many ways it's a horrible idea!
E2. Future connections, not yet funded // Conexiones futuras, aún no financiadas
- 4th Ave Extension: MM-8a
Future Thoroughfare
Project Sponsor: Walla Walla
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: New Roadway Connection
Current Cost: $2,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: 4th Ave
To: Future: NR-61View DetailsDetails
- Eagle Crest Dr
Future Thoroughfare
Project Sponsor: Walla Walla
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: New Roadway Connection
Current Cost: $330,600
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Eagle Crest Dr
To: Kendall RdView DetailsDetails
- McMinn Rd Extension
Future Thoroughfare
Project Sponsor: College Place
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: New Roadway Connection
Current Cost: $450,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: McMinn Rd
To: SR 125View DetailsDetails
- 4 years 6 months ago
-
Anonymous
This intersection is close to that of Old Milton Highway. I wonder what would happen if College Avenue were to dead-end or follow the frontage road to OMH via Aufty Ln and the driveway to 2264 OMH.
- Myra Rd - Rees Ave
Future Thoroughfare
Project Sponsor: Walla Walla
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: New Roadway Connection
Current Cost: $433,200
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Dell Ave
To: Rees AveView DetailsDetails
- PLAZA WAY MP 0.00 TO MP 0.34
Future Thoroughfare
Project Sponsor: Walla Walla County
Safety Focus: -
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: -
Current Cost: $760,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: 0
To: 0.34View DetailsDetails
- Prescott New Road: Parallel to Skyrocket Rd
Future Thoroughfare
Project Sponsor: Prescott
Safety Focus: -
Pedestrian: -
Bicycle: -
Vehicle Capacity: New Roadway Connection
Current Cost: $433,200
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: W 4th St
To: UGA BoundaryView DetailsDetails
- Southside extension: Clarence-Doans Extension
Future Thoroughfare
Project Sponsor: College Place
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Off-road Path
Vehicle Capacity: New Roadway Connection
Current Cost: $2,629,800
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Julia Street
To: Brickner RdView DetailsDetails
- 4 years 5 months ago
-
Cheryl Zuver
I definitely oppose this project. It will add too much traffic to Brickner Road. Who would be responsible for patrolling this area? No one stops at the stop sign on the corner of Brickner and Grandview, my husband was broadsided at that intersection. I vote NO
- 4 years 5 months ago
-
Jeffrey Fernald
The Clarence-Doans Extension is an ill-conceived idea. It would takeout a septic drain field, a well , a house, and maybe even another house. It would increase traffic on Brickner and Clarence, narrow roads and somewhat dangerous now. They will be very dangerous for children, pedestrians, and cars.
- SW 4th Street Extension
Future Thoroughfare
Project Sponsor: College Place
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Buffered Bikelane
Vehicle Capacity: New Roadway Connection
Current Cost: $1,077,600
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Doans Avenue
To: Academy WayView DetailsDetails
- SW Davis Street Extension Project
Future Thoroughfare
Project Sponsor: College Place
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: New Roadway Connection
Current Cost: $1,584,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Fourth Street
To: 12th StreetView DetailsDetails
- 4 years 6 months ago
-
Anonymous
New north-South road needed in College Place to the west of College Avenue
- 4 years 5 months ago
-
Anonymous
There in no need to push SW Davis to 12th St, there is a street on the west side of College Ave It's name is Bade St. and that plenty.
- US 12/Wallula to Nine Mile Hill - P8: CN Phase
Future Thoroughfare
Project Sponsor: WSDOT
Safety Focus: Previous Fatality Location
Pedestrian: -
Bicycle: Widened Shoulder 4+ ft
Vehicle Capacity: New Roadway Connection
Current Cost: $195,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Wallula
To: Nine Mile HillView DetailsDetails
- Walla Walla New Road: NR-61
Future Thoroughfare
Project Sponsor: Walla Walla
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: Bikelane
Vehicle Capacity: New Roadway Connection
Current Cost: $20,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: SR 125
To: Lower Waitsburg RdView DetailsDetails
- Walla Walla New Road: NR-61 Extension
Future Thoroughfare
Project Sponsor: Walla Walla
Safety Focus: -
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: New Roadway Connection
Current Cost: $1,048,800
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Lower Waitsburg Rd
To: Middle Waitsburg RdView DetailsDetails
- 4 years 6 months ago
-
Anonymous
This whole road is long overdue, imo. I'd like to see it extended to Airport Road.
- Wilbur Ave Extension - Bryant to Reser
Future Thoroughfare
Project Sponsor: Walla Walla
Safety Focus: Protect Pedestrians and Bicycles
Pedestrian: Curb-tight Sidewalk
Bicycle: Signed/Shared Route
Vehicle Capacity: New Roadway Connection
Current Cost: $3,000,000
Plan Phase: Unfunded - long-term planning
Future Cost: -
From: Bryant
To: ReserView DetailsDetails